Have you ever tried to find out where the clothes you wear are made? Or work out whether they were made ethically or sustainably? It’s actually much harder than you might expect because often each part of the manufacturing process happens in a different place and even the company you’re buying from might not know the answer. It’s exactly the same when it comes to construction materials, and it’s something most of us never consider. So when you get asked about how those materials are sourced it comes as a bit of a surprise.

Anna Beckett_columnist crop

Anna Beckett

On one of my recent projects I was asked a question I’d never been asked before; “if we can’t source European steel, would you be ok with steel from South Korea?” and honestly, I didn’t know the first thing about steel manufacturing in South Korea. And so I headed down a rabbit hole…

The steel manufacturing process is hugely important to the construction industry, yet it’s something most of us don’t often have to deal with. So maybe it’s time for a quick reminder of some GCSE chemistry (yes I’m groaning too). Typically steel is made by extracting iron ore using a blast furnace and then it’s processed through a Basic Oxygen Furnace (BOF) to produce steel. This process requires the blast furnace to be heated to extremely high temperatures using coke (coal). But there is another way to make steel, using an Electric Arc Furnace (EAF). The EAF process uses largely recycled steel and can be powered much more by renewables. It’s still an energy intensive process, but much better than BOF.

So why is this difference important? Well, if you’re looking to reduce embodied carbon on your projects EAF steelwork is significantly better than BOF, and the EU has a lot of EAF capability so the steel we import is typically lower embodied carbon. Here in the UK we don’t currently have any EAF facilities – there should be EAF at Port Talbot at some point in the near future but issues connecting to the grid mean that it’s currently delayed.

But that shouldn’t be an issue because most of our steel is imported anyway right? Not quite, there’s a couple of other factors that need to be taken into consideration. At the start of 2026 the EU’s Carbon Border Adjustment Mechanism (CBAM) came into force and if you’re not quite sure what that is, bear with me because it’s not the most straightforward system to explain.

Currently the EU Emissions Trading System (EU ETS) sets a cap on emissions from certain higher carbon sectors, and the allowances within that cap are sold or traded in units of one tonne of carbon dioxide equivalent. Over time the cap is intended to reduce and in turn the number of allowances also reduces. In practice this means that higher carbon products and materials become more expensive and lower carbon products and materials should become cheaper and therefore more attractive to buyers.

The CBAM allows the EU to impose the same limitations on materials being imported into the EU, so that cheaper, higher carbon materials from other parts of the world can’t be used to undermine the EU’s decarbonisation policies. This applies to all products that are considered to be carbon-intensive so many construction materials, and in particular steel and concrete, are affected.

At the same time the UK launched “The UK Steel Strategy”, which looks to prioritise and increase domestic steel production (including EAF in the long term) and apply tariffs to imported steel. The combination of the EU CBAM and UK Steel Strategy, as well as an increasingly challenging global geopolitical landscape, appears to have led to a situation where EU steel has become more difficult to procure.

Which leads back to the original question – can we source steel from South Korea? As it turns out South Korea have significant EAF capability, the steel meets all UK standards and South Korean steel is transported to the UK by boat meaning that the increase in carbon associated with the transport is limited. There are other factors to consider, but in this case, we considered it to be a suitable replacement. But the process of answering the question made me realise that where the materials we use come from is likely to become increasingly important as we try to design sustainably in an increasingly turbulent world.